OPSEC — “Protect Critical Information” — think before you share.
M1102 / M105A2 Tactical Trailer PMCS
Perform these checks before every movement. Items marked NFMC deadline the trailer until corrected. Never hook up or move a trailer with an NFMC fault.
Monitor these items during movement. Stop immediately if any NFMC condition is observed. Do not continue movement with an unsafe trailer.
Perform these checks after every movement. Annotate all faults on DA Form 5988-E before releasing the trailer.
Perform these checks weekly or every 350 miles of towing, whichever comes first. Trailer must be unhitched and on level ground.
Perform these checks monthly or every 1,500 miles of towing, whichever comes first. Includes comprehensive inspection and lubrication.
NFMC items deadline the trailer. Any fault on a No Further Movement Criteria item means the trailer must not be hooked up or moved until repaired. Annotate all faults on DA Form 5988-E and report to your prime mover crew chief immediately.
M1102 / M105A2 TRAILER PMCS — COMMON QUESTIONS
What TM covers M1102 and M105A2 trailer PMCS?
What are NFMC faults on a tactical trailer?
What is the difference between the M1102 and M105A2 trailer?
How do I fill out a DA Form 5988-E for a tactical trailer?
RELATED PMCS CHECKLISTS
Trailers are towed by HMMWVs and JLTVs — know the prime mover PMCS too: