OPSEC — “Protect Critical Information” — think before you share.
MEP Tactical Generator PMCS
Perform these checks before every generator start. Items marked NFMC deadline the generator until corrected. Never start a generator with an NFMC fault.
Monitor these items during generator operation. Shut down immediately if any NFMC condition is observed. Do not leave a running generator unattended in a tactical environment.
Perform these checks after every generator shutdown. Allow engine to cool before checking oil and coolant levels.
Perform these checks weekly or every 50 operating hours, whichever comes first. Generator must be shut down and cool before performing weekly PMCS.
Perform these checks monthly or every 200 operating hours, whichever comes first. Includes oil change and comprehensive system inspection.
NFMC items deadline the generator. Any fault on a No Further Movement Criteria item means the generator must not be operated until repaired. Annotate all faults on DA Form 5988-E and report to your unit maintenance immediately.
MEP TACTICAL GENERATOR PMCS — COMMON QUESTIONS
What TM covers MEP tactical generator PMCS?
What are NFMC faults on a MEP tactical generator?
How often should I change the oil on a MEP generator?
How do I fill out a DA Form 5988-E for a MEP generator?
RELATED PMCS CHECKLISTS
Generators power the motor pool and command post — know the vehicles they support: